Preparation work before starting the sealing machine

2017-08-24 08:57:39
times

Before starting up and using the sealing machine, the following preparations are required:




1. Before using the new machine, an electromagnetic safety switch should be installed on the power supply to reduce the risk of power outages.




2. Pay attention to the motor steering. If the steering is incorrect, you can change the wiring position of any two of the three wires to change the steering




3. New machines should pay attention to the adjustment of the automatic can removal system.




Adjust the nut under the "foot pedal support can hinge ear" of the can sealing machine, so that when the "foot pedal" is pressed down, the "push rod" is used to make the lower edge of the "can support shaft cam" and the upper edge of the "roller" form a tangent line, which is moderate. If the distance between the two is insufficient, the sealing cannot be activated. If the distance between the two is too large. If the sealing is repeated, the can cannot be automatically removed, or the strength of the can support is uneven, resulting in sliding of the can.




Support the "can support shaft" with one hand, and use a wrench to loosen the "can support shaft adjustment clamping screw" with the other hand. Step on the 'foot pedal' to raise the 'can tray'. Place an empty can and adjust the distance between the top of the "can tray" and the upper end of the protruding part of the "rolling head" to subtract 1/8 from the height of the uncovered can? At this point, fix the "clamping screw" in place.




4. Adjust the gap between the first roller and the rolling head.